While the NPRM might do much to reduce the number of projects requiring IRB review, it would do little to improve the quality of review for those projects for which it is still required. This is a retreat from the more ambitious plans of the 2011 advance notice of proposed rulemaking.
[Cross-posted from Institutional Review Blog]